T3_B – Project Preparation Workshop: Configuration & Preparation

T3_B Only bookable in the complete training pagage → T3

  

Objectives          

During the Workshop the Project Team will prepare the base artefacts for the discovery workshops leaded by an experienced GK Consultant.


Target group

Functional Consultant
Technical Consultant

 

Requirements

Prerequisite for participation is at least participation in course T1 (M10+M20), it is recommended to participate the course T2 as a prerequisite.

 

Content

  • Advanced Storemanager Functions

  • Update procedure (manual and CDPL)

  • Prepare Demo System for Discover Workshop Phase

  • Prepare Master Data Import with customer oriented items


Modules

  • M70 - Basic Project Methodology : Content
    (This module will be trained onsite or via webex)
  • M85 - Workshop - Functional Project Preparation : Content


Module M70 - Basic Project Methodology: Content

  • This training covers the basic GK Project Methodology as well as the collaboration of GK with a Partner within a project.
  • The training guides also trough the various project phases concentrating on the activities, main deliverables, the tools and templates.

  • Participants will learn how to use the GK Methodology documentation.

  • The Partner and GK work together in one project. GK will introduce the Governance Modell.


leer 3B

Table of Content:

  • Partner Portal: How to find Project Methodology

  • Overview of GK Project Methodology

  • Prepare & Discover phases

  • Implementation phases

  • GK Governance Modell:

    • Collaboration GK <> Partner


Module M85 - Workshop - Functional Project Preparation: Content

  • Base for the Workshop is the environment that was created during “T90 Standard Installation”.
  • During this Workshop the Project Team will prepare the base artefacts for the discovery workshops leaded by an experienced GK Consultant.

  • A focus will be on the settings for Master Data Import and the Peripheral transaction upload (SAP Store Device Control by GK)

  • The Content of this workshop is individually adapted to the scope of the planned project.


Table of Content:

  • Misc. Functions in Storemanager

  • Configure Logo on receipt

  • Receipt Configuration (Advanced)

  • Customization of CSS Styles and xHTML Layouts (UI)

  • Prepare Demo System for Discover Workshop Phase

  • Configure all necessary stores tenders, taxes etc.

  • Include all functions on the screen that customer requested and that are needed according to RFP

  • Prepare Master Data Import with customer oriented items

  • Prepare a sheet of paper with the items, pictures of the items and barcodes ready to be scanned

  • Peripheral Devices, at least Scanner and Printer (only Standard Devices are in Scope)

  • SAP Integration for download of Master Data and Upload of Peripheral transactions (support of SAP PI Consulting required)

  • Monitoring with Enterprise Cockpit